Thursday, October 15, 2026

Dunn Loring School / Center

An image of the front (east) elevation of the Dunn Loring Center, a Colonial Revival one-story brick building with a gable roof. In the foreground is the building's metal sign and flagpole.

On my commute to work, one of my routes takes me past the Dunn Loring Administration Center. It's a darling Colonial Revival former school building that is now getting demolished for a new school building. 

In the 1930's, Fairfax County Public Schools (FCPS) sought to modernize its school facility fleet, phasing out one and two-room schoolhouses in favor of larger ones with more amenities and indoor plumbing. They applied for grant money to build eight of these schools through the Public Works Administration (PWA), part of the New Deal to help restart America's economy following the Great Depression. The school system decided one of these new schools should be placed in Dunn Loring. They bought a plot of land from Joseph Bolden Taylor, a Black man who had been enslaved earlier in his life (and then lived to be 103, passing away in 1950!). Construction on the school started December 31, 1938. Due to Dunn Loring and other concurrent construction projects, Fairfax actually pushed back the first day of school in 1939 from September 7th to 21st so they would all be ready to open for students. 

When Dunn Loring did open, the segregated White elementary school started out with five classrooms and an auditorium in the center. The population had continued to grow during the school's planning and construction phases, so it was immediately overcrowded. Two pairs of permanent classrooms were built onto the building in 1940 and 1944, bringing the total classrooms up to nine, as well as a cafeteria expansion in 1950. Temporary solutions were also implemented, including adding two quonset huts and converting the auditorium to classroom duty at times. Eventually, more schools were built in the area so Dunn Loring could have a manageable student population size. 

Dunn Loring, and the rest Fairfax County, would remain segregated until 1960, when the courts forced the school system to start desegregating. The White and Black student populations slowly merged together, fully completing the process in the fall of 1966. 

In 1978, after nearly 40 years, the Dunn Loring School was closed. While it had received an infrastructural update in 1975, the area's school population had shrunk considerably. The 1978-79 school year projected Dunn Loring to be 50% empty, so the school system closed the school and divvied its students to the nearby schools. After sitting empty for a decade and a brief 2-year lease to the Islamic Saudi Academy, the building was converted into school administrative offices between 1988-1990 and received an addition of a new wing. Along with offices, the building also housed special education and parenting programs. The Dunn Loring Administrative Center would keep this role for another nearly 40 years.

The southern elevation of the Dunn Loring Center, with two stories viewable.
Dunn Loring's southern elevation

By 2021, the population around Dunn Loring was growing again. With that in mind, the Fairfax School Board voted on a plan to convert the Dunn Loring Center back into an elementary school. They contracted Samaha Associates to work on the designs. Fairfax touted that they "have the opportunity to return the building to its original purpose and support the needs of students in the surrounding community. The repurposing of the Dunn Loring Administrative Center will provide approximately 900 students with an elementary school rooted in history and poised to provide 21st-century learning, preparing young children for bright futures."

A year later, Samaha and Fairfax released three site layout options. All of them involved demolishing the current building in favor of a newer facility. What happened? Fairfax released the following statement:
"The design consultant evaluated the potential to reuse any portion of the building as part of the design process. Unfortunately, we could not keep any of the original building and meet current educational requirements. To attempt to reuse the building would also increase costs significantly."
Community members were not happy with the chosen direction for the property. They noted multiple potential problems, including increased traffic and safety concerns, tree preservation, encroaching on nearby housing plots, and building a large building on such a tiny parcel of land. They also wondered if the school was even necessary to begin with, with some attendance forecasts showing the surrounding elementary schools projecting to have declining attendance over the next couple of years. 

When it came time for the Fairfax County Planning Commission to vote on the plan, they initially deferred their vote due to wanting more information and more community outreach. Many on the commission criticized the school system for their "dismissive" attitude toward historic preservation in general, as well as not working with the Fairfax County History Commission nor the Fairfax Architectural Review Board on these plans. Eventually, Fairfax did start working with the groups, and thus was able to get some movement on site approvals. During a later rezoning vote over the site with the Fairfax Board of Supervisors, FCPS was further reminded to "be a good neighbor." FCPS did agree that they would save some items for an interpretive exhibit in the new school building, including the front entryway, the school's PWA plaque, and 50 bricks.

Earlier this year, the Dunn Loring Administrative Center closed down in phases, with its programs and offices moving to different buildings. The center was emptied of furniture, utilities were cut, and the building was made ready for its impending destruction. Demolition started around the second week of September. The process has been slow. It appears the school system is recycling the building's materials, so they are sorting through the rubble looking for what can be salvaged. Once demolition concludes later this month, work will begin on the new four-story school. It is expected to open in Fall 2028 and enroll approximately 1,000 students. 


It's a little sad to see so much work go into actively not doing anything towards historic preservation initially. I definitely agree that Fairfax Schools has been very blasé towards the building. Personal anecdote time: back in the spring, I emailed the school system to ask if I could visit the school and take some pictures of the interior to document the building prior to its demo. They responded that there was a Dunn Loring Center Heritage Day with guided tours on Saturday, May 30th, 10am-12pm. It sounded like an interesting event, so I moved some plans around for that day so I could visit. I got there around 11:35am, where I found staff already breaking things down. There had been guided tour(s) earlier, but none at my arrival time. In fact, I actually had to speed through viewing the building because they were closing and locking it all prior to 12pm. Between myself and some alumni I spoke to, we agreed the event was not well publicized. Ending a 2-hour event earlier than it was scheduled? You set a low bar of expectations and still managed to not clear it. It would have been nice for FCPS to have made a little more of a bigger deal about this. 

Here are some of the pictures I took around the school on that day:

Front entry of the Dunn Loring School. One of the front doors is propped open, its inside obscured in shadow.

Looking up at the white-painted woodwork surrounding the Dunn Loring Center's front doorway. It features square panels.
Woodwork around front door

Looking up the stairs from the front entry of the Dunn Loring Center. Through the double doors are some people milling around in the room beyond.
View from the front door. 
One alum told me the door to the left was the Principal's Office.

Looking at an archway to an adjoining hall with simple yet decorative corner accents.
I loved the archways

A medium-sized tree sits in the middle of a grassy area, surrounded by brick walls with windows.
Courtyard in the middle of the school

The front entry room in the Dunn Loring Center. The room is mostly empty except for a pile of folding chairs, folding tables, and three doorways.
The white wall in-between the doorways was originally where the stage was.

A men's bathroom with walls covered in large tan tiles. In the corner is a slightly elevated platform with white porcelain urinals, around 3 feet tall.
Men's bathroom in oldest wing

An empty classroom with blue carpet. The room has some random objects remaining, including two rolling chairs and one square table.

Looking down a hallway with windows and doors. Further down the way is one person walking.
Hallway

Blue elevator doors in a hallway. The walls are tiled halfway up the wall. The doors say "Elevator" on them.
"Elevator"

An empty classroom with linoleum tiles. Paper fish hang from the ceiling. An underwater mural runs along one wall.

A yellowed sign next to a window. It says "PLEASE DO NOT OPEN THE WINDOWS IN THIS ROOM. REASON: YOU MAY BE ABLE TO CLOSE THEM BACK AGAIN BUT YOU WILL NOT BE ABLE TO LOCK. THANK YOU!!!"

A small rectangular room with white walls and linoleum tile. It has a couple stacked chairs and six hand sanitizers on pedestals.
Backrooms vibes in the former Vending Machine room

Looking out the front entry double doors. One of the doors is open, showing a road, grassy area, and front sign beyond.


Dunn Loring is a sweet little school that served so many generations of students and school administrators. Sad to see it go, but it had a great run. Here's to you, Dunn Loring.



SOURCES


(If you liked this piece, I write history on a lot of schools in neighboring Loudoun County on my other blog, My Summer with Loudoun Schools. Check it out!)

Wednesday, June 3, 2026

2026 Presidents Park Williamsburg Revisit

A gray concrete box in the woods, surrounded by dead leaves and brown pine needles.

I returned to Presidents Park. No, not where the heads from Presidents Park Williamsburg are currently sitting (You want to see that? Check out my previous post). I went back to their original home, now an overgrown walking path. Yeah, not as thrilling or artistic, but it's still around!

While I posted about Presidents Park in 2024, I actually visited the site the summer of 2022. When I was getting ready to post, I noticed via satellite imagery that there had been some changes at the site in-between 2022 and 2023. Vegetation around the back gazebo had been significantly cut back. What was going on? So it had been on my to-do list to stop by at some point and reinvestigate things. This time, during the winter when plants wouldn't get in my way as much.


The Presidents Park paths were much easier to traverse this time. Tree limbs had been cut down, paths had been rediscovered, and tire tracks from some construction vehicle were marked on the concrete. Already nature was starting to reclaim some sections again with pine needles. Even though, the previous hour-long trek around turned into an easy 10-15 minute stroll. I was laughing at myself for how short it was, and how close the neighboring Wyndham Garden hotel was to the back end of the site. I had no idea in the summer overgrowth a couple years ago.

A gray concrete box is surrounded by trees in the woods during the winter. In the distance is a brick multistory hotel building.

A Presidents Park path lined by trees, vines, and lamp posts in winter. The path is slightly covered by pine needles.

A Presidents Park path lined by trees, vines, and lamp posts in winter. The path slowly disappears under pine needles.

A gray concrete box partially broken in the former Presidents Park. Trees grow around it, and a white signpost frame lays on top of a corner.

Significant clearing had happened around the gazebo. You could walk all the way around it now.

A white gazebo stands in a clearing in a wooded area in winter.

The Visitor Center looked more-or-less the same, so I didn't take any shots of it. Here's the comparison views from the Visitor Center's balcony:

An image of an elevated view of Presidents Park when it was still open. There is a winding, looping path, white presidential busts on gray bases, informational signs, and lampposts. In the back is the top of a gazebo-like roof structure.
Presidents Park, 2005
View from the 2nd floor deck of the visitor center.
"263_6311" by David via Flickr [CC-BY-2.0]

An image of a similar elevated view of Presidents Park from 2022. A rain-stained concrete path forks, its branches disappearing into a thick forest of trees. In the foreground is mown grass and one lamppost.
Presidents Park, 2022


An image of a similar elevated view of Presidents Park from Winter 2026. The plants have been thinned, so more of the curving concrete path is visible, along with another lamp post. The grass is yellow.
Presidents Park, 2026
(lining it up better with the 2005 photo)

In 2022, George Washington's pedestal seemed inaccessible with plant growth. In 2026, it's a lot easier to walk down its dedicated path.

A path leading up to a gray concrete box with trees growing out of it. The path is partially covered with brown pine needles.

Closer up to the gray concrete box that was in the previous photo. It is surrounded by trees in winter.
Former pedestal for the George Washington head


So why did a minor clean-up happen? In November 2022, Ryson Development, L.P. bought the property for $2 million. Most likely, they wanted to inspect/have an appraisal done on the existing conditions of the park section, so they cut down the plants to get to some areas. 

Ryson has offered spaces in the former visitor center up for lease through Cushman & Wakefield | Thalheimer. There doesn't seem to be any immediate future plans for the park portion of the property. In the marketing materials I found, they briefly mention its existence: "Adjacent parcel offers future development opportunities and potential access to outdoor green space (formerly President's [sic] Park)." (I love how they say "potential access." Sure, if plants are kept under control. Machete to cut through not included!)

If/when redevelopment happens, it will be interesting to see how things play out. Technically, the park portion of the property is a separate parcel of land than the visitor center and its parking lot. While they currently function together, there is a very small access route from the road that could be used as a drive onto that property. If Ryson or a future developer wants to redevelop both properties to work together, that may spell doom for the former Visitor Center. Between a wireless communication tower and a retention pond, the Visitor Center is the only viable bridge between the two properties. That was the right setup for its outdoor museum days, acting as a gate of entry for paying guests, but if they want that land parcel connection, the Visitor Center's gotta go.

A topographical map of Presidents Park land, property lines, and the immediate adjacent properties.
Screenshot from York County GIS map viewer.
223 Water Country Pkwy is highlighted


Changing the subject to news outside the park borders, sculptor artist David Adickes passed away last year. He didn't end up finding a permanent home for his Houston presidents heads collection during his lifetime. So far, there seem to be no updates on them, other than an advertisement on Adickes' website for the option of buying individual ones or the whole collection. 

There is an unfortunate deadline for the studio. Houston's highways are in the midst of a multibillion-dollar redesign. Construction on the interchange that sits around the studio is scheduled to start in 2028, with the studio most likely being acquired by eminent domain and demolished. Will the third set of presidential heads be lost or saved? Only time will tell.


To wrap things off:
If you want to rent offices next to Presidents Park Williamsburg, click here!
If you want to buy an individual/whole collection of presidential head sculptures, click here!


A Presidents Park path lined by trees, vines, and lamp posts in winter. The path slowly disappears under pine needles.

SOURCES
York County GIS Map (accessed 5/25/26)

OTHER POSTS